Design Progress | Week 15
Dates: 11/25/25 - 12/02/25 This week’s efforts were focused on finalizing documentation, improving mechanical components of the NAVI system, and preparing the necessary materials for final testing and project presentation. I continued developing and refining the written report, completing the remaining sections and ensuring all content was aligned with project requirements. On the mechanical side, I reprinted the face support using FlexiTough material to increase durability a


Design Progress | Week 14
Dates: 11/19/25 - 11/25/25 This week, I completed the final prints of both the faceplate and front plate and thoroughly cleaned all remaining support material, sanding the edges to prepare for the installation of the internal neoprene comfort layer. After etching the surface, I adhered the neoprene lining inside the faceplate and verified a smooth, secure fit. Modified and newly printed fittings, inserts, and TPU wire plugs were finalized to ensure proper installation of the


Design Progress | Week 13
Dates: 11/12/25 - 11/18/25 This week, progress was made on both the NAVI device hardware and the accompanying design report. Using the feedback from Dr. Ejaz and the report rubric, I expanded the document’s structure—including updated chapters 1, 2, and 4—while refining the table of contents, list of figures, and list of tables. Custom headers and footers were also added for consistency and professionalism. On the hardware side, I completed the design of Front-Plate V6 and Fa


Design Progress | Week 12
Dates: 11/05/25 - 11/11/25 This week’s progress involved extensive refinement and troubleshooting of the NAVI headset’s front assembly. During inspection of the latest print, an error was discovered on the front plate—a small gap in the left-center IR sensor mount caused the support material to strip when removed. After reviewing the CAD model, several loft and extrude modifications were made to strengthen the internal supports for the IR sensors and reduce excessive support


Design Progress | Week 11
Dates: 10/29/25 - 11/04/25 This weeks progress centered on finalizing the front plate design and developing a reliable method to connect it to the face plate. After numerous trials attempting to directly join the two geometries, it became clear that creating large shims would be the most effective solution. These shims will act as adapter components that bridge the gap between the front and face plates, compensating for their complex curvature and ensuring a secure fit. Work


Design Progress | Week 10
Dates: 10/22/25 - 10/28/25 During this weeks progress, the primary focus was on refining the headset’s front plate design and addressing complex alignment issues with the face plate. Over twenty hours were dedicated to iterating through multiple design versions in Fusion 360, concentrating on finalizing the curvature, internal supports, and mounting geometry to ensure accurate alignment and strength. Despite significant effort, directly modifying the face plate geometry prove


Design Progress | Week 9
Dates: 10/15/25 - 10/21/25 This week, I focused on refining several design and structural aspects of the NAVI headset. I began by redesigning the front plate to address the alignment and connection issues encountered during last week’s attempts to finalize the faceplate assembly. In addition, I designed new side and rear infrared (IR) sensor mounts using Fusion 360 and initiated the 3D printing process with FlexiTough (flexible PLA) material to improve user comfort when wear


Design Progress | Week 8
Dates: 10/08/25 - 10/14/25 This weeks progress was made on both the NAVI website and hardware development. The “Weekly Meetings” pages for both the Senior Proposal and Senior Design sections were corrected after reverting to a default layout, restoring the intended design and formatting. Updates were also made to the monetary expenses section based on Dr. Ejaz’s feedback to ensure grammatical accuracy and clarity. On the hardware side, the CAD model of the front plate was rev


Design Progress | Week 7
Dates: 10/01/25 - 10/07/25 This week’s progress involved project documentation, budgeting, and hardware design. First, The project...


Design Progress | Week 6
Dates: 09/24/25 - 09/30/25 This week, progress was made on both the hardware and design aspects of the NAVI project. The USB-C charging...


Design Progress | Week 5
Dates: 9/17/25 - 9/23/25 This weeks progress was made across documentation, materials research, prototyping, and component updates. The...


Design Progress | Week 4
Dates: 09/10/25 - 09/16/25 This weeks progress to the NAVI involved both the design and electronics fronts of the project. I updated the...


Design Progress | Week 3
Dates: 09/03/25 - 09/09/25 This weeks progress involved both the physical prototyping and electrical systems of the NAVI project. The CAD...


Design Progress | Week 2
Dates: 08/27/25 - 09/02/25 This week, I updated the project website’s progress log so that entries now appear under both subcategories,...


Design Progress | Week 1
Dates: 08/20/25 - 08/26/25 This week involved progress across both the website development and the design aspects of the senior project....


Interim Progress Report
Dates: 07/26/25 - 08/17/25 Over the semester break, the NAVI project faced an unexpected challenge. A laptop failure during a software...


Proposal Progress | Week 12
Dates: 7/21/25 - 7/27/25 During Week 12, strides were made in both the technical design and presentation aspects of the NAVI project. One...


Proposal Progress | Week 11
Dates: 7/14/25 - 7/20/25 This past week, I concentrated on enhancing both the visual and technical aspects of the NAVI project...


Proposal Progress | Week 10
Dates: 07/07/25 - 07/13/25 This week, I continued developing my skills in CAD using self-guided tutorials in Fusion 360. I made further...


Proposal Progress | Week 9
Dates: 6/30/25 - 7/06/25 This week, I created and implemented a new “Codes and Standards” page on the NAVI project website, gathering and...