During this weeks progress, several new website sections were developed and key updates were made to align the project with its latest direction. UI/UX improvements continued with enhancements to interface elements, standardized layout spacing, and a refreshed color palette for improved visual consistency and readability across devices.

 

The main page was revised to reflect feedback from the recent weekly meeting, with updates centered on the new primary capstone proposal — the Boundary Computer for Assisted Navigation (BCAN). Both content and imagery were updated to align with this shift in project focus. Although no changes were made to existing system block diagrams, the ParkSense and BTL visual assets remain accessible, with updates for BCAN planned following further research. Initial research was conducted on key components for BCAN, specifically investigating wearable form factors, haptic feedback methods, and inclusive design principles.

 

A new Time and Effort page was also created to document weekly team contributions, styled to match the site’s color and layout scheme. A structured table was implemented for logging time and summarizing tasks. Additionally, a Survey page was built using the same design framework, featuring an embedded Google Form to collect user insights — currently pending publication.

 

Finally, a Weekly Meetings page was developed using a collapsible FAQ-style menu with integrated animations and theming. Documentation from Weeks 2 and 3 was transferred into this new format to improve accessibility and organization.

 
 
 